Maintenance Manual for Collaborative Robot
English
English
  • Maintenance Manual for Collaborative Robot
  • About this manual
    • Copyright
    • Notation rules
    • Safety precautions
  • 1. Safety
    • 1.1 Safety requirements
      • 1.1.1 Applicable standards
      • 1.1.2 Safety performance
    • 1.2 Safety measures
      • 1.2.1 Safety functions
      • 1.2.2 Safety training
      • 1.2.3 Safety labels
      • 1.2.4 Emergency stop
        • 1.2.4.1 Emergency stop switches
        • 1.2.4.2 Connecting to emergency stop devices of external systems
    • 1.3 Risk assement
    • 1.4 Potential risk
    • 1.5 Validity and responsibilities
  • 2. Introduction to the product
    • 2.1 Intended uses of the product
    • 2.2 Product components
    • 2.3 Part names
      • 2.3.1 Manipulator
      • 2.3.2 Controller
      • 2.3.3 Teach pendant
    • 2.4 Nameplate
  • 3. Product installation
    • 3.1 Environment of installation and preparation
      • 3.1.1 Environments of installation and use
      • 3.1.2 Spaces of the robot system
      • 3.1.3 Allowable limit of wrist axis load
      • 3.1.4 Payload
    • 3.2 Product installation
      • 3.2.1 Composition of robot systems
      • 3.2.2 Robot and controller installation
        • 3.2.2.1 Mounting plate installation
      • 3.2.3 Tool connection
      • 3.2.4 Wiring
      • 3.2.5 Power on
    • 3.3 Robot interface
      • 3.3.1 Tool flange connection point
        • 3.3.1.1 T4071017041-001 (TE) pin map
        • 3.3.1.2 T41171130012-001 (TE) pin map
        • 3.3.1.3 Air hose
      • 3.3.2 External device interface
        • 3.3.2.1 Terminal block (TB1): common analog I/O signals
        • 3.3.2.2 Terminal block (TB2): dedicated safety signal input
        • 3.3.2.3 Terminal block (TB3): system signal I/O
        • 3.3.2.4 D-sub 25-pin connector (SDIO): common digital I/O
        • 3.3.2.5 D-sub 9-pin connector (COM1, COM2): serial communication (RS485, 422)
    • 3.4 Stopping distance and time
      • 3.4.1 STOP 0
      • 3.4.2 STOP1
    • 3.5 Safety setting
    • 3.6 Programming and restarting
    • 3.7 Axis limiting devices
    • 3.8 Movement without drive power
    • 3.9 Other safety precautions
  • 4. Maintenance
    • 4.1 Checking of the collaborative robot
      • 4.1.1 Check sheet
      • 4.1.2 Wiring check
      • 4.1.3 Bolt check
    • 4.2 Maintenance of the collaborative robot
      • 4.2.1 Replacement of internal wiring
      • 4.2.2 Replacement of the integrated driving module
        • 4.2.2.1 Replacement timing
        • 4.2.2.2 Weight of the integrated driving module
        • 4.2.2.3 Tools and parts
        • 4.2.2.4 Recommended posture in disassembling the integrated driving module
        • 4.2.2.5 Method for replacing the integrated driving module
      • 4.2.3 Encoder backup battery replacement
      • 4.2.4 Grease replacement
    • 4.3 Controller check and maintenance
      • 4.3.1 Internal structure
      • 4.3.2 Safety control module
        • 4.3.2.1 Connection and display
        • 4.3.2.2 Connection of I/O signals for the robot system (TBSYS1)
        • 4.3.2.3 Safety I/O signal connection (TBSDI, TBSDO)
        • 4.3.2.4 Connection of common digital I/O signals (TBDIO)
        • 4.3.2.5 Connection of common digital I/O signals (TBAIO)
        • 4.3.2.6 Information on major components
      • 4.3.3 Power precharge module (PPM)
        • 4.3.3.1 Connection and display
        • 4.3.3.2 Information on major components
      • 4.3.4 Regenerative discharge module (RDM)
        • 4.3.4.1 Connection and display
        • 4.3.4.2 Information on major components
      • 4.3.5 Microcomputer module
      • 4.3.6 Power supply
      • 4.3.7 Teach pendant
      • 4.3.8 PCI communication card (optional)
        • 4.3.8.1 Connect pin map
  • 5. Moving and storing
    • 5.1 Moving method
      • 5.1.1 Recommended posture
      • 5.1.2 Packaging box
      • 5.1.3 Cautions
    • 5.2 Storing method
    • 5.3 Disposal
  • 6. Appendix
    • 6.1 Block diagrams
      • 6.1.1 YL012 S-axis
      • 6.1.2 YL012 H-axis
      • 6.1.3 YL012 V-axis
      • 6.1.4 YL012 R-axis
      • 6.1.5 YL012 B-axis
      • 6.1.6 YL012 R1-axis
      • 6.1.7 YL012 tool flange
      • 6.1.8 Power connector
    • 6.2 System specifications
      • 6.2.1 Collaborative robot
      • 6.2.2 Controller
      • 6.2.3 Teach pendant
  • Certifications
  • Attachment
    • Rules on Occupational Safety and Health Standards, and Notice for Safety Inspection
  • Quality Assurance
Powered by GitBook
On this page

Was this helpful?

  1. 3. Product installation
  2. 3.2 Product installation
  3. 3.2.2 Robot and controller installation

3.2.2.1 Mounting plate installation

Previous3.2.2 Robot and controller installationNext3.2.3 Tool connection

Last updated 3 years ago

Was this helpful?

The firmness of the floor on which the manipulator will be installed should be designed to minimize the dynamic impact of the robot. If the firmness of the installation surface is not sufficient for supporting the robot arm, a mounting plate for the product installation may be used.

[Warning]: The robot installation surface should be firm enough to bear both the weight of the robot and the load that occurs during robot operation.

  1. Check the installation surface of the collaborative robot, and remove any uneven points, cracks, and others.

  2. Place the mounting plate on the surface on which the manipulator will be installed.

  3. Pass the anchor bolts (M20) through the bolt holes of the top contacting surface of the mounting plate, and fixate them by fastening to an adequate torque or by hammering them. The anchor bolts should not protrude from the contacting surface of the mounting plate by no more than 0.2 mm (±0.1 mm).

  • The flatness of the other areas should be no more than ±0.2 mm.

  • The flatness of the four sheets of the mounting plates should be no more than 0.2 mm.

  • The flatness of the four contacting surfaces of the mounting plates should be no more than 0.2 mm (±0.1 mm).

  • Fill any gaps with shims when necessary.